Thailand › Bangkok › Asoke, Bangkok

Locality · Bangkok, Thailand

Asoke, Bangkok

Latest

What is changing in Asoke.

  1. Sep 2026

    Asoke area falls under city-wide flood disaster declaration

    What it meansHeavy rain can still disrupt central Bangkok streets and access.

  2. Sep 2026

    Draft city plan would make Asok Montri very high-density housing zone

    What it meansCould allow taller homes along Asok Montri, if the plan is approved.

  3. Jun 2026

    Cabinet approves 17 to 45 baht common rail fare for 2027

    What it meansCheaper transfers at Asok and Sukhumvit stations, if launched on time.

Show all 5 updates
  1. Jul 2025

    Sukhumvit Model clean-up targets Nana, Asoke and Phrom Phong

    What it meansClearer pavements and fewer street problems near Asoke homes.

  2. Mar 2025

    Owners of tall buildings told to check safety after earthquake

    What it meansAsk any Asoke condo seller for its 2025 safety check report.

From The Nation and Public Relations Office. Plans and dates are theirs; what it means is our reading.

Getting here

Where it is.

  • The Watthana district office names Sukhumvit Road, Soi Asok Montri, Soi Thong Lo, Soi Ekkamai and Soi Pridi Banomyong as the district's main roads.
  • BTS lists Asok (station code E4) on its Sukhumvit Line.
  • The MRT operator lists Sukhumvit (BL22) as a station on the MRT Blue Line.

Watthana District Office, Bangkok Metropolitan Administration, annual action plan B.E. 2565 · BTS Skytrain (Bangkok Mass Transit System PCL), route map page · Bangkok Expressway and Metropolitan PCL (MRT operator), Blue Line station map, checked 29 September 2026

About Asoke

What is known about it.

  • The Khlong Toei district office describes Sukhumvit Road as the dividing line between Khlong Toei district, on the south side, and Watthana district, on the north side; the split dates from 1995, and Watthana was constituted as a district with effect from 6 March 1998.

Khlong Toei District Office, Bangkok Metropolitan Administration, summary of annual action plan B.E. 2566, checked 29 September 2026

Projects here

3 projects, in the developers’ own words.

In the developers’ own words, as they publish them. NITARYA checks a project only inside Acquire & Own, for the client who chooses it, and every project here stands on the same footing.

Last checked 29 September 2026. Prices, ownership rules, costs and our own analysis are not shown on this page.